Waverock Tier III Data Center Retrofit
2N Redundancy
Live Cut-over
IEC 61439
100%
Uptime Maintained
1.4 PUE
Power Efficiency
18 Months
Execution Time
Hyperscale Infrastructure

Waverock Tier III Data Center Retrofit

Tata Consultancy Services (TCS)

The Challenge

Retrofitting a 5MW power backbone in a live, high-density server environment. The client required a transition to 2N redundancy without a single second of IT load downtime.

The Engineering Solution

We engineered a parallel busbar trunking system with temporary bypass feeds. The execution involved 24/7 shifts during low-traffic windows to cut over critical loads rack-by-rack.

"A rare partner who actually understands 'Mission Critical'. Zero drama, absolute precision."
EV Powertrain Regenerative Test Rig
Regenerative Braking
Thermal Chamber
High-Speed DAQ
+40%
Validation Speed
99.8%
Torque Accuracy
60 kW
Energy Recovery
AutoTech R&D

EV Powertrain Regenerative Test Rig

TVS Motor Company

The Challenge

TVS needed to validate a new EV motor design under extreme thermal and torque conditions. Existing off-the-shelf rigs lacked the specific regenerative load simulation required.

The Engineering Solution

EDS designed and fabricated a custom 100kW AC Dynamometer with an integrated thermal chamber. The system feeds braking energy back into the grid, simulating real-world driving range.

"EDS didn't just build a rig; they engineered a competitive advantage for our R&D team."
Defense Electronics ISO 7 Clean Room
ESD Protection
Precision HVAC
ISO 14644
Class 7
ISO Class
Zero Defects
Audit Result
IMod Standards
Compliance
Defense Infrastructure

Defense Electronics ISO 7 Clean Room

Kalyani Rafael Advanced Systems

The Challenge

Establishing a sterile assembly line for missile defense electronics. The facility required strict temperature (±0.5°C) and humidity control to prevent component corrosion.

The Engineering Solution

We deployed a modular clean room system with precision HVAC and HEPA filtration. The electrical system included ESD-safe grounding grids to protect sensitive avionics.

"Defense auditing is unforgiving. EDS delivered a facility that passed every check on the first attempt."

Have a Mission-Critical Challenge?

Don't rely on standard contractors for non-standard problems. Let's discuss your engineering requirements.

Discuss Your Project

EDS Assistant